HomeResidencesSpecificationsFacilitiesLocationDeveloperContact
The 50m lap pool at Terra Hill, the planted hillside embankment on one side and Terra House at the far end - artist's impression

Hoi Hup Realty · Sunway Developments

The joint venture, and the team it hired

Hoi Hup Sunway Kent Ridge Pte Ltd, Developer’s Licence C1435.

The joint venture

Hoi Hup Sunway Kent Ridge Pte Ltd

Terra Hill is developed by a joint venture between Hoi Hup Realty and Sunway Developments, under Developer’s Licence C1435.

The two have built together in Singapore for years, and the naming convention here is the one they use on each project: a single-purpose company named for the site, in this case Kent Ridge, which is the ridge the estate sits below.

The view out from Terra Hill over the roofs of the estate towards Pasir Panjang and the sea beyond - artist's impression
Looking out over the estate towards the sea, artist's impression.
Project particulars
ParticularDetail
DeveloperHoi Hup Sunway Kent Ridge Pte Ltd
Developer’s LicenceC1435
LotLot 02062L MK03, Queenstown planning area
Building Plan approvalA1716-00007-2021-BP01 dated 23 December 2022
TenureFreehold
Site area19,365 sqm, about 208,443 sq ft
Plot ratio1.4
Expected TOPQ3 2026
Notice of vacant possession9 January 2028
Notice of completion9 January 2031

A word about the dates

Three dates, and only one of them is a forecast

Expected TOP — Q3 2026

The developer’s estimate of when the Temporary Occupation Permit is granted and keys are handed over. This is the one that matters if you are planning a move. It was written in February 2023.

Vacant possession — 9 January 2028

A contractual long-stop date in the sale agreement, not a construction estimate. The developer undertakes to deliver by then, and it is set well beyond the expected date on purpose.

Completion — 9 January 2031

The other long-stop, for the Certificate of Statutory Completion. Three years after vacant possession, for the same reason.

Buyers routinely read the 2028 and 2031 dates as the project running late. They are the standard backstops that appear in every Singapore sale and purchase agreement. The date to ask about is TOP — and since the fact sheet giving Q3 2026 was written in early 2023, ask for the current position rather than relying on it.

The team

Who designed and built it

DisciplineFirm
ArchitectP&T Consultants Pte Ltd
Main contractorStraits Construction Singapore Pte Ltd
Civil & structural engineerTenwit Consultants Pte Ltd
Mechanical & electrical engineerUnited Project Consultants Pte Ltd
Landscape architectSitetectonix Private Limited
Project interior designer2edesign Studio Pte Ltd
Show flat interior designer2edesign Studio Pte Ltd and Index Design Pte Ltd

Terra Hill

Want to see what else they have built?

Hoi Hup and Sunway have a long joint track record in Singapore. Happy to walk you through the comparable ones nearby.

WhatsApp